Winter Stitchin’ List

Sarah at FairyFace Designs is hosting a list for all of us crafters on what our plans are to finish for the next 4 or 5 months.

FairyFace Designs

Here is my list:

I have 5 quilt tops that need to be basted, quilted and bound.

Finish my Bottled Rainbows quilt

Design 2 new quilts

Learn how to use EQ7 (I’ve had the software for 1.5 months and haven’t used it all yet!)

Make 4 mug rug Christmas Gifts

Valentine’s Day Projects: pillowcase dress for Anne, sewn handmade cards for the grandparents & hubby

Set of 4 place mats for my kitchen table

Baskets for my sofa table (4 small & 4 large) – I need to find the right fabric for this (may try mod podge for the first time on this project!)

I have 2 stockings to finish for Lyanna at Purple Panda Quilts

My monthly swap & bee blocks – I am committed to 5 per month right now

My final Pay It Forward gift

I would really like to make stockings for my nieces and nephews too…but I’m not really sure that will get accomplished

Publish my quilted pouch pattern – pictures later (they are trapped on my camera right now!)

What is on your list?

 

About Melissa Dunworth

Owner/Operator
This entry was posted in Uncategorized. Bookmark the permalink.

4 Responses to Winter Stitchin’ List

  1. Rita Goshorn says:

    my list is unmentionable! i don’t have deadlines, so i just do what the mood dictates … sometimes i cut [make kits], sometimes i make tops, some times i do applique by hand. then once in a while, i layer and quilt. i have 11 tops, 8 kits, 2 applique pieces, 7 bundles ready to cut, 4 ready to bind, 3 ready to quilt. i have 5 knitting and crochet wip’s. small pieces come and go with greater frequency.

  2. Carrie P. says:

    I don’t like thinking that far ahead. too stressful for me. lol
    I do want to get a red and white challenge quilt done before the year is over. And I can’t use a commercial pattern so I have to design it my self.

  3. Lisa L. says:

    I have 2 stockings to make for the same project as you! 🙂 Also have 5 advent calendars to design/construct, as well as two sets of mug rugs. Not to mention two birthday hats before I can do any of that! 🙂 Busy, busy, busy!!

  4. Your list is great! Can’t wait to see those quilts finished and your other projects too. Thanks for linking up 🙂

Comments are closed.